Skip to main content

The PsychCafe
Share, connect, and learn.
Not sure who is the designated mod for this forum, but perhaps any mod could look into this for me, if they could, please.

I think it's a great idea to have the three sticky threads stickied, but I've found that I often miss posts to the first two threads because the chat thread acts like a visual cut off (for me anyway.) Is there any chance of putting the chat thread to the very top, because that never gets posts, and that makes the other two stickied threads seem more like a part of normal posting?

Hope this doesn't cause any problems, just thought I'd ask while I'm in a posting mood Cool

Thanks

LL
Original Post

Replies sorted oldest to newest

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×